Low Inflow Protocol — Stage 2
Duke Energy has conservation measures in effect for this lake.
The primary generating unit at Cedar Cliff hydro station on the East Fork of the Tuckasegee River is offline to complete necessary improvements to maintain reliable and efficient energy service for our customers. A spillway gate will be opened, as needed, to manage reservoir levels. Duke Energy will also be utilizing the spillway gate to provide the recreational releases for the 2026 season. Traditionally, releases have occurred every Wednesday, Thursday and Saturday. For 2026, releases will be on Tuesday, Thursday, and Saturday to avoid consecutive days of potentially warm water releases through the spillway gate. This ensures we protect the aquatic life in the river that so many enjoy. Dangerous high flow conditions can exist downstream of Cedar Cliff hydro station and will be significantly higher during rainfall events. Updated lake levels are available any time at duke-energy.com/lakes, by calling 800.829.5253, or on the Duke Energy Lake View mobile app.
Issued Sep 9, 2026 by Duke Energy.
Lake Level (% of full pond)
Percent of full pond, as published by the operator — a share of the water, not an elevation
As ofPublished by Duke Energy
Full pool
2330.0 ft
Cedar Cliff Lake is located in NC. Water level data is provided by Duke Energy. The full pool elevation is 2330.0 ft. The latest reading is 96.90 % of full pond. Duke Energy has declared stage 2 restrictions here; see the notice above for current guidance.
A small badge a marina, lake association or guide can paste on their site. It always includes a link back to Cedar Cliff Lake on LakeLevels — that is the entire point.
Recommended — places a real link on the host page.